Solutions · 6 areas

Six solutions. One mindset: build a system into it.

I don’t offer a list of services. I offer a solution for when many related packaging, retail or print materials need to be designed consistently and taken safely into production – wherever you print.

The DelightAD model

Creative and production decisions aren’t made in two separate worlds.

Classic designer

Delivers the artwork – production is the client’s problem.

Classic printer

Can produce – but the creative system is the client’s problem.

DelightAD

One point of responsibility from strategy and production-ready artwork to – if needed – the delivered result.

  1. 01Problem
  2. 02Strategy
  3. 03Design system
  4. 04Production-ready artwork
  5. 05Production support
  6. 06Finished solution

FMCGProduct companies

Packaging Design & Design Systems

Let’s not just design a box. Let’s build a system for the next one too.

A scalable visual and production system for new products and product families – from the master design and dieline to PDF/X production files.

  • Master design
  • SKU system
  • Dieline & prototype
  • PDF/X production files
Details

FMCGTrade marketingProduct companies

POSM & Retail Communication

The key visual is just the start. The real work begins when it has to work on twenty surfaces.

Consistent adaptation of one campaign to many formats, retailers and production specs.

  • Master layout
  • Format mutations
  • Retailer adaptations
  • Production coordination
Details

FMCGProduct companiesGrowing brands

Print Design Systems

One system. Many formats.

Recurring printed communication in a modular, reusable and production-safe system.

  • Grid & style system
  • InDesign masters
  • Color control
  • Brand Vault
Details

Growing brandsProduct companiesRetail brands

Brand Identity & Visual Systems

Let’s not design a logo. Let’s build a visual language.

Not logo design: the visual infrastructure for your future packaging, print and retail communication.

  • Logo system
  • Color & typography
  • Visual language
  • Brand guidelines
Details

FMCGProduct companies

Packaging Rollout & SKU Adaptation

A rollout works best when the rules were set on the very first pack.

Controlled extension of an existing packaging system to new SKUs, sizes, languages and markets.

  • SKU mutations
  • SKU checklist
  • Version control
  • Localization
Details

FMCGProduct companiesDesigners

Prepress & Production Consulting

Good prepress is invisible. Bad prepress is very expensive.

Technical audit and decision support to reduce risk between design and production – with your printer or ours, anywhere.

  • Prepress audit
  • Risk list
  • Cost optimization
  • Production worldwide
Details

Which one do you need?

Different business situation. Different entry point.

Most projects touch several solutions. This order shows where it makes sense to start.

How do they connect?

One visual language that every further system builds on.

The identity provides the visual infrastructure. The packaging system builds on it, and from that come the rollout, POSM and printed communication. The prepress mindset runs through all of them.

  1. 01Brand identity
  2. 02Packaging system
  3. 03SKU rollout
  4. 04POSM & retail
  5. 05Print system

Prepress & production: at every step, not at the end.

Production, wherever you print

Your printer, or ours. Three levels of production support.

Print-ready files

Worldwide.

Artwork built to your printer’s specs – color setup, dielines, ink limits, finishing layers – checked and documented.

Coordination with your printer

Worldwide, remotely.

Specs, file handover, proof review and press-check guidance directly with your local printer or converter.

Full production from Central Europe

EU delivery.

End-to-end production through trusted partners in Central Europe – one point of contact from file to delivery.

Next step

Not sure where to start? Let’s talk it through.

Tell me what you’re working on. Based on the project brief, I’ll tell you which solution – or which combination – fits your situation.

  1. 01You send the project brief
  2. 02I prepare for the task
  3. 0330-minute strategy call
  4. 04Clear scope and proposal